Community /

One year of Solar Power at Simba’s Head Office

Published on: 08 October 2020

In 2019 Simba began its journey into renewable energy with the installation of a number of solar panels at our head office in Melbourne with the aim to reduce our operating carbon footprint.

Solar panels installed at Simba Global headquarters

We are proud to announce that since installation, we have achieved a 42% reduction in our kWh usage with a further 31% generated and fed back into the grid. This means that as of today, our head office is consuming just 27% of the electricity that it did pre-solar installation.